Merry Christmas from the Boston Central Artery/Tunnel (Big Dig) BAT Team!
<br />
<br />BACKGROUND
<br />
<br />Officially known as "Ramp A-CN" under Big Dig contract #C17A6, this on-ramp is located on Atlantic Avenue, near from historic Rowes Wharf and High Street in downtown Boston. This is one of the only three key I-93 northbound on-ramps in downtown which carries thousands of motorists per day, giving them a quick ticket out of the city from surface roads.
<br />
<br />Ramp A-CN was first opened to traffic in March 29, 2003 when I-93 northbound was officially shifted from the old elevated via-duct to new underground tunnel system. However, A-CN was holding up the weight of the old elevated central artery via-duct for another year and was running at limited capabilities. It became fully operational to its maximum designed capacity at around Sep 2005, after old "Green Monster" elevated via-duct was finally torn down and ground was broken for the Wharf District Parks Project.
<br />
<br />In 2004, there was a proposal to build Boston Museum on space between ramps A-CN and CS-P. But Boston Museum Project has since been reassigned to develop on Parcel 12 (ramps CS-SA and CN-SA) near Quincy Market instead. Currently,
<br />New Center for Arts and Culture sponsored by Jewish Community Centers of Greater Boston has been permitted to develop on top of this ramp and CS-P.
<br />
<br />The New Center for Arts and Culture building is designed by Daniel Libeskind and is expected to cost approximately $40 million with a projected completion date of 2011. However as of late 2006, no agreements have been signed yet and space surrounding this ramp and CS-P has already been revitalized by garden parks and walkways.
<br />
<br />
<br />DEscriptION AND INSTALLATION INSTRUCTIONS
<br />
<br />This release includes the following products:
<br />
<br />BIGD-C17A6.A-CN:
<br />The main component of this release. Ramp A-CN, known as Atlantic Avenue I-93 Northbound On-ramp near High Street and Rowes Wharf in downtown Boston.
<br />
<br />BIGD-T1X-ONR1:
<br />Proof-of-concept implementation of a basic Big Dig 2.0 on-ramp (Blue Gantry).
<br />
<br />BIGD-T1X-ONR1B:
<br />Proof-of-concept implementation of a basic Big Dig 2.0 on-ramp (Black Gantry).
<br />
<br />Misc. Signs, Etc.:
<br />See Parks & Recreations Menu for some added stand-alone signs, etc.
<br />
<br />
<br />DEPENDENCIES (DOWNLOAD AND INSTALL THESE FIRST)
<br />
<br />This release *requires* Boston Central Artery/Tunnel / Big Dig 1.0 release in Simtropolis Exchange (STEX) as a dependency. This release only includes on-ramp. Off-ramps in Big Dig 1.0 release are required to complete a functioning tunnel network.
<br />
<br />Although not required, it is recommended that you use this product with Network Add-On Mod (NAM) and 10x transit network capacity increase mod for best experience.
<br />
<br />
<br />IMPORTANT NOTICE FOR BETA TESTERS
<br />
<br />Please de-install all Big Dig Beta installations prior to installing this product. You can either use the included uninstaller inside the "Boston CAT 2.0" folder in your SC4 plugins directory, or simply delete the whole "Boston CAT 2.0" folder yourself and proceed with installation.
<br />
<br />
<br />PRODUCT SUPPORT AND REPORTING PROBLEMS
<br />
<br />Report problems or seek advice at "Boston Central Artery/Tunnel (Big Dig)" project thread under "Custom Content -> Modding - Transit Networks" forum at Simtropolis.com. Please do not PM the author or its contributors with your own individual problems, we get enough PM's already and are busy with real-life obligations to attend to personal individual technical problems. We prefer community-based approach to product support where knowledged users and contributors can help out and provide suggestions wherever possible.
<br />
<br />
<br />AUTHORS & CONTRIBUTORS
<br />
<br />blahdy: Project Design/Management and 3D Modelling
<br />Swamper77: Production, 3D LOD Design, Game Integrations |